Area GuideSurrey Langley SkyTrain: Stations, Opening Date and What It Means for Homes
Where the 8 stations sit, when trains start, what can be built around them, and how to weigh a home nearby.
By Shawn Kandola, PREC ·
If you own or are shopping for a home along Fraser Highway, the Surrey Langley SkyTrain will shape the area for years. On September 15, 2026 the Province named it the Dave Barrett Extension, but the project site and most searches still use the old name, or call it the Surrey SkyTrain extension.
Every fact here comes from the project, the Province, BC’s Transit-Oriented Area rules and the City and Township plans, checked on November 5, 2026. Prices are the Fraser Valley Real Estate Board’s October 2026 benchmarks.
The short answer
- Yes, Langley is getting SkyTrain. The line runs 16 km along Fraser Highway from King George Station to 203 Street in Langley City, with 8 elevated stations: 6 in Surrey and 2 in Langley, at Willowbrook and Langley City Centre.
- The official opening is late 2029. Major construction began in November 2024, and in September 2026 the guideway was about 65% complete, with all 8 stations under construction.
- Langley City Centre to King George Station will take 22 minutes, more than 25 minutes faster than today’s bus, and Waterfront Station downtown will be 65 minutes away with no transfer.
- Within 800 metres of each station, BC’s Transit-Oriented Area rules set minimum allowable heights, 20 storeys within 200 metres. Nothing is rezoned automatically, and the project’s business case makes no estimate of any effect on home prices.
Surrey Langley SkyTrain stations, west to east
The line extends the Expo Line 16 km, mostly along Fraser Highway on an elevated guideway, from King George Station to 203 Street in Langley City. All 8 stations are above ground, 3 include a bus exchange, and trains run through as part of the Expo Line, so there is no transfer at King George.
| Station | Cross street | Municipality | Neighbourhood | Listings page |
|---|---|---|---|---|
| Green Timbers | 140 Street and Fraser Highway | Surrey | Green Timbers | Surrey |
| 152 Street | 152 Street and Fraser Highway | Surrey | West Fleetwood | Fleetwood |
| Fleetwood | 160 Street and Fraser Highway | Surrey | Fleetwood Town Centre | Fleetwood |
| Bakerview-166 Street | 166 Street and Fraser Highway, bus exchange | Surrey | East Fleetwood | Fleetwood |
| Hillcrest-184 Street | 184 Street and Fraser Highway | Surrey | West Clayton | Clayton |
| Clayton | 190 Street and Fraser Highway, a new intersection | Surrey | East Clayton | Clayton |
| Willowbrook | 196 Street and Fraser Highway, bus exchange | Township of Langley, where Surrey and both Langleys meet | Willowbrook | Langley |
| Langley City Centre | East of 203 Street and Industrial Avenue, bus exchange | City of Langley | Langley City Centre | Langley |
Locations from the project’s stations page. The July 2026 status report puts Clayton Station at 189 Street. Links to each listings page are in the notes below.
Green Timbers and 152 Street
Green Timbers Station sits on the western edge of Green Timbers Urban Forest, beside the Jim Pattison Outpatient Care and Surgery Centre, with access to Surrey Memorial Hospital; see homes for sale in Surrey. 152 Street Station serves West Fleetwood, which the project says is slated for further growth.
Fleetwood and Bakerview-166 Street
Fleetwood Station is in the heart of Fleetwood Town Centre, and Bakerview-166 Street sits beside the Surrey Sports and Leisure Complex. Both, with 152 Street, fall under the City of Surrey’s Fleetwood Plan, whose final Stage 2 version is due at council between fall 2026 and winter 2027. See homes for sale in Fleetwood.
Hillcrest-184 Street and Clayton
Clayton Station is set to be Clayton’s main commercial hub under the City’s Clayton Corridor Plan, which is expected at council in summer 2027. The line’s planned maintenance facility sits between Fleetwood and Clayton, at the southeast corner of Fraser Highway and 176 Street. See homes for sale in Clayton.
Willowbrook
Willowbrook Station, by Willowbrook Mall, has a bus exchange meant to bring in riders from the Township and Cloverdale. The Township’s new Willowbrook Community Plan is paused while it seeks a change to the Langley Airport Zoning Regulation. Browse homes for sale in Langley.
Langley City Centre
The project calls the last station the catalyst for a major revitalization of the area. The City of Langley adopted a new zoning bylaw in March 2026, and its plan puts the tallest buildings around the 196 Street and 203 Street stations: up to 15 storeys, and taller outside the airport zoning area. See Langley townhomes and condos.
Is Langley getting a SkyTrain?
Yes. Langley gets 2 stations: Willowbrook, in the Township of Langley at 196 Street, and Langley City Centre, in the City of Langley at 203 Street, where the line ends.
No official plan, funding or study takes SkyTrain past Langley City Centre, whether to Willoughby, along 200 Street, to Aldergrove or to Abbotsford. TransLink’s plan for 200 Street is Langley-Haney Place bus rapid transit: 22 km, 13 stations, every 10 minutes at peak, linking to SkyTrain at Willowbrook. It has preliminary funding only.
Newton and Guildford are not on the line either. Their 2018 light rail plan was suspended in favour of SkyTrain on Fraser Highway, and King George Boulevard through Newton is now planned as bus rapid transit, every 5 minutes at peak, also on preliminary funding.
How long will it take to build the SkyTrain to Langley?
The official answer is late 2029. Early works began in spring 2024 and major construction in November 2024, so it takes about 5 years from major construction to the first train. Testing and commissioning run from December 2026 to September 2029.
The date has moved once: the 2022 business case planned 2028, and in August 2024 the Province changed it to late 2029. By September 21, 2026 the guideway was about 65% complete, its piles and columns more than 95%, and work was well underway at all 8 stations.
| Stage | Starts | Ends |
|---|---|---|
| Early works | May 2024 | October 2024 |
| Utility, civil and roadworks | August 2024 | November 2027 |
| Guideway | November 2024 | July 2027 |
| Stations | May 2025 | December 2028 |
| Trackwork and systems | April 2026 | December 2028 |
| Testing and commissioning | December 2026 | September 2029 |
| Service starts | Late 2029 |
Source: monthly status report, July 2026, the latest published as of November 5, 2026.
How much does the Surrey Langley SkyTrain cost?
The budget is $5.996 billion. The 2022 business case estimated $3.94 billion; in August 2024 the Province raised it by $2.056 billion, or 52%, citing inflation, commodity, supply chain and labour costs and higher contractor bids. By the end of July 2026, $2.800 billion had been spent, about 47% of the budget. The federal and provincial governments fund it, and it includes 30 new SkyTrain cars and 14 km of walking and cycling paths.
How long is the SkyTrain ride from Langley, and how often will trains run?
The official trip from Langley City Centre to King George Station is 22 minutes, more than 25 minutes faster than the bus today, and Langley City Centre to Waterfront Station downtown is 65 minutes with no transfer.
No timetable has been published. The 2022 business case modelled a train about every 6 minutes at peak and every 10 minutes midday east of 140 Street, which is a planning assumption, not a promise.
Park and ride is not part of the project, though the City of Surrey is planning 300 spaces within a 5 to 7 minute walk of stations including Green Timbers, 152 Street, Fleetwood and Bakerview-166 Street. Every station gets an enclosed bike parkade, and TransLink expects to adopt the area plan covering local bus changes in late 2027.
What can be built near a SkyTrain station? Transit-Oriented Areas explained
BC law sets minimum heights and densities within 800 metres of a SkyTrain station and 400 metres of a bus exchange, in zones called Transit-Oriented Areas. They cover planned stations too, so all 8 new stations have one: Surrey designated its areas on June 10, 2024, and the Province designated Willowbrook’s on May 2, 2025.
In plain words, these numbers are a minimum a council cannot refuse, not automatic zoning. No lot is rezoned in advance and a builder still has to apply, but a council may not turn a rezoning down for its height or density if both are at or under the minimum. Councils can still allow more.
Floor area ratio is floor space divided by lot area, so on a 7,000 square foot lot, 3.0 allows 21,000 square feet and 5.0 allows 35,000. Cities also cannot require residential parking in these areas, apart from accessible stalls, though builders can still include it.
Local limits remain: part of the Willowbrook area falls under the Langley Airport Zoning Regulations, with Logan Creek, a red-listed watercourse, along its northern edge. If you own inside these circles, know your tier before you price; a Surrey home evaluation or Langley home evaluation can start there.
| Distance | Density (FAR) | Height |
|---|---|---|
| Within 200 m of a SkyTrain station | 5.0 | 20 storeys |
| 200 m to 400 m | 4.0 | 12 storeys |
| 400 m to 800 m | 3.0 | 8 storeys |
| Within 200 m of a bus exchange | 4.0 | 12 storeys |
| 200 m to 400 m of a bus exchange | 3.0 | 8 storeys |
Source: B.C. Reg. 263/2023. Bus exchange bands apply in Surrey and the City of Langley. A lot partly inside 2 bands counts as wholly inside the higher one.
Will the SkyTrain raise home prices near the stations?
Nobody can promise a gain, and the official record does not try: the project’s business case contains no estimate of any effect on home or land values, and we found no BC Assessment statement on it.
The most relevant study we found is a 2018 Concordia University master’s thesis. In Vancouver, apartments listed closer to a SkyTrain station had higher asking prices; for detached homes the results were mixed. It used asking prices from 2 week-long periods in 2016 and is not peer reviewed, so read it as a hint about condos, not a forecast for Fleetwood or Clayton.
Prices along the line have also moved with the wider market: the Fraser Valley composite benchmark was $860,000 in October 2026, down 6.4% in a year, and every benchmark below fell while the guideway went up. Supply is growing too. The City of Surrey’s consultants forecast the Fleetwood Plan area absorbing 9,680 to 12,177 apartments by 2041, which means choice for buyers and competition for owners of older condos.
To see what the line is worth on a particular home, compare Surrey townhomes and condos near and far from a station, or ask for a price opinion if you are selling in Surrey or selling in Langley.
| Board area | Detached | Townhouse | Apartment |
|---|---|---|---|
| Langley | $1,448,100 (down 6.5%) | $800,600 (down 3.7%) | $522,300 (down 8.4%) |
| Cloverdale, includes Clayton | $1,326,400 (down 6.0%) | $757,900 (down 4.4%) | $501,800 (down 8.8%) |
| Central Surrey | $1,288,000 (down 8.9%) | $744,300 (down 4.5%) | $453,600 (down 12.2%) |
FVREB MLS Home Price Index, October 2026, released November 3, 2026; change against October 2025. A board area is far wider than a station area.
Should you buy near a future SkyTrain station? What to weigh
A home near a station means an easy commute from late 2029, and living through the rest of the build until then. If you want a station that already runs, presale condos in Surrey City Centre sit by the existing Expo Line, and our guide to GST on new homes covers the rebates on new builds.
Count the construction years
Guideway work runs to July 2027, roadworks to November 2027 and stations to December 2028. Closures come and go: from November 12, 2026, Fraser Highway between Whalley Boulevard and 140 Street is local access only, 24 hours a day, into December.
Stand where the trains will run
The guideway and stations are elevated. Check how close the home sits to the track and what its windows and balcony face, and visit at rush hour and in the evening.
Check the parking
New buildings near stations need not provide residential parking, and park and ride is not part of the project. Confirm how many stalls come with the home and whether they are assigned.
Read SkyTrain marketing closely
If a presale leads with the SkyTrain, measure the walk to the real station from the cross streets above, compare its completion date with the late 2029 opening, and remember that date has already moved once.
Read the plan for the street
Fleetwood’s Stage 2 plan and the Clayton Corridor Plan are not final, and the Willowbrook plan is paused, so what the lot next door becomes may not be decided yet.
Know the 176 Street site
Near Fraser Highway and 176 Street, the maintenance facility site has gravel and sand hauling to spring 2027, then preload settlement to late 2029.
Frequently asked questions
Is Langley getting a SkyTrain?
Yes, 2 stations: Willowbrook, in the Township of Langley at 196 Street and Fraser Highway, and Langley City Centre, in the City of Langley at 203 Street. Both open with the line in late 2029.
How long will it take to build the SkyTrain to Langley?
About 5 years. Major construction started in November 2024 and service is scheduled for late 2029. In September 2026 the Province said work was on schedule.
When will the Surrey Langley SkyTrain open?
The official date is late 2029. The 2022 business case planned 2028, the Province moved it to late 2029 in August 2024, and the status reports through July 2026 repeat it.
What are the Langley SkyTrain stations?
Willowbrook Station, at 196 Street and Fraser Highway by Willowbrook Mall, and Langley City Centre Station, east of 203 Street and Industrial Avenue at the end of the line. Both have a bus exchange.
Where are the Fleetwood SkyTrain stations?
On Fraser Highway at 152 Street in West Fleetwood, at 160 Street in Fleetwood Town Centre (Fleetwood Station), and at 166 Street in east Fleetwood (Bakerview-166 Street, with a bus exchange).
Will there be park and ride at the new SkyTrain stations?
Not as part of the project. The City of Surrey is planning 300 park and ride spaces within a 5 to 7 minute walk of stations including Green Timbers, 152 Street, Fleetwood and Bakerview-166 Street.
Can a tower be built next to my house near a SkyTrain station?
Possibly. Within 200 metres of a station the minimum allowable height is 20 storeys, then 12 storeys to 400 metres and 8 to 800 metres. A builder must still apply to rezone, but a council cannot refuse for height or density at or under those minimums.
Will SkyTrain go to Willoughby, Aldergrove or Abbotsford?
No official plan, funding or study extends SkyTrain past Langley City Centre. Along 200 Street, TransLink plans the Langley-Haney Place bus rapid transit line, which links to SkyTrain at Willowbrook and still needs more funding.
Sources
- Surrey Langley SkyTrain, project overview
- Surrey Langley SkyTrain, stations
- Surrey Langley SkyTrain, benefits and travel times
- Surrey Langley SkyTrain, current work
- Monthly status report, July 2026
- Monthly status report, June 2024 (budget and date changes)
- South of Fraser maintenance and storage facility
- Station design engagement boards, November 2024 (park and ride)
- Province of BC, news release, September 21, 2026
- Province of BC, Dave Barrett Extension naming, September 15, 2026
- Local Government Transit-Oriented Areas Regulation, B.C. Reg. 263/2023
- Provincial Policy Manual: Transit-Oriented Areas, version 4.0
- Order in Council 207/2025, Willowbrook Transit-Oriented Area
- City of Surrey, Fleetwood Plan
- City of Surrey, Clayton Corridor Plan
- Township of Langley, Willowbrook Community Plan
- City of Langley, Official Community Plan
- TransLink, bus rapid transit program
- TransLink, South of Fraser East Area Transport Plan
- Eftekhari (2018), rail station types and housing prices, Concordia University thesis
- Fraser Valley Real Estate Board, monthly statistics
General information, not legal, tax, mortgage or financial advice. Program rules and figures were checked in November 2026 and can change; confirm your own situation with your lender, lawyer, notary or accountant.